image
image

ALD is a global supplier of electronic atomization technology solutions. Currently, the company has three major manufacturing bases in operation, and the new manufacturing bases are under construction, all of which are located in Bao’an district of Shenzhen. Now it has a modern manufacturing center of more than 40,000 square meters and a production and manufacturing team of more than 3,000 people. The monthly production of atomizing equipment is up to 30 million pieces

 

Sticking on the core concepts of scientific management and lean production, ALD takes the lead with top industry standard production facilities and complete set of 8 s management pattern, the GMP standard production environment, ISO9001 quality management system for the efficient production and strict quality control to provide the most powerful, stable and reliable one-stop service for hundreds of customers in the world.

 

While pursuing delicacy, we also strive to improve production efficiency from every controllable link. From the perspective of product technology, the technology of ceramic coating is derived from ceramic and metal coating technology (SILMO™), thus greatly reducing the labor and time cost of the cotton coating assembly process. From the perspective of energy saving, we implement the strict principle of " The man goes and puts out the lamp ", so as to reduce the running time of equipment and extending the service life. Meanwhile, we make contribute to the national environment energy saving efforts on water saving and electricity saving, etc. In addition, ALD also set up a proposal improvement system on encouraging employees to provide suggestions about the company's development and operation management with effective incentive strategies.Relying on strong and mature automation production equipment, orderly process operation mode, rigorous and efficient scientific management, thoughtful staff care. 


  Global Reputation and Quality Certification


In October 2010, ALD was certified by ISO9001 quality management system.

In 2011, ALD won the Good Manufacturing Practice(GMP) certification.

In January 2013, ALD industrial park was completed and put into production.

In 2014, an innovative food-grade dust-free workshop was put into use.

In September 2014, the inhalation materials laboratory was established in conjunction with Sun Yat-Sen University and Zhengzhou University.

In June 2015, the basic materials research institute was established.

In March 2017, ALD was certified by the intellectual property management system.

In October 2017, the second manufacturing plant was completed and put into production. Recently, two new high-precision automatic assembly lines have been introduced to ensure the consistency of high yield and quality, and to provide customers with industry-leading high-quality sincere services.


  • image
  • image
  • image
  • image
  • image
  • image
  • image
  • image